China supplier Hydraulic Post Hole Auger Drill for Mini Excavator Backhoe Loader pto shaft cover removal

Product Description

RAY ATTACHMENTS Earth Auger is a kind of CHINAMFG hole machine. It can be mounted to all common hydraulic excavators as well as mini excavator and other carrier like skid steer loaderbackhoe loader,telescopic handlerwheel loader and other machinery.Our auger drive can installed with earth drill, stump planner, mixer bowl for different uses.

Specification:

Model Oil Folw Max Torque Pressure Rotary Speed Carrier Oil Hose Drill Dia.
gal./min I/min Lbf·Ft N·M Psi Bar Rpm T Inch mm
REA2000 6-14 23-53 2537 1871 3000 205 40-92 1-2.5 1/2 100-400
REA2500 8-16 30-61 3297 2432 3000 205 40-82 1.5-3 1/2 100-500
REA3000 8-16 30-61 3900 2877 3500 240 40-81 2-3.5 1/2 100-600
REA3500 8-18 30-68 4900 3614 3500 240 32-72 2.5-4.5 1/2 100-750
REA4500 10-20 38-76 5719 4218 3500 240 32-64 3-5 1/2 100-900
REA5000 10-20 38-76 6855 5056 3500 240 29-58 4.5-7 1/2 150-600
REA5500 12-22 45-83 8012 5910 3500 240 28-50 5-7 1/2 150-750
REA6000 12-28 45-106 8338 6150 3500 240 34-80 6-8 3/4 150-900
REA7000 16-32 61-121 9397 6931 3500 240 37-72 7-10 3/4 150-900
REA8000 16-36 61-136 1571 8048 3500 240 29-64 8-12 3/4 150-900
REA10000 18-36 70-136 14612 1571 3500 240 26-45 10-13 3/4 150-900
REA12000 21-37 80-140 16236 11976 3500 240 22-43 13-17 1 150-900
REA15000 21-40 80-151 20399 15046 3500 240 20-39 13-17 1 150-1200
REA20000 21-45 80-170 25812 19039 3500 240 17-34 13-20 1 150-1200
REA25000 24-48 90-180 33825 24949 3500 240 16-30 15-23 1 150-1200
REA50000 26-74 100-280 68052 50195 4000 280 11-30 21-50 1 300-2400

Aslo, these details just help you know our products quickly. Please feel free to contact with me ,that’s my duty and honor to help you find the appropriate product.

Packed in strong wooden box, Not easy to be damaged during transportation.

If you want to promote your own brand, We can also provide OEM service .(custom your own brand, color, shape and so on you requested) 

If you have these business, feel free to contact us. We sincerely invite global dealer!

HangZhou CHINAMFG International Co., Ltd is a professional manufacturer which was found in 2002 has a lot of experience in construction machinery attachments producing and serving.Our factory is located in HangZhou City, ZheJiang Province, Near to ZheJiang City. Which has large capacity to make various kinds products like hydraulic breaker, earth auger, quick hitch, Vibro ripper,pile breaker and other construction machinery attachments.We are always researching to improve our products’ performance and innovate designing to meet more and more clients’ demands.

Q: Are you a manufacturer?

A: Yes,our factory was established in 2002 and we have our own trading company.

 

Q: Are you sure your product will fit my excavator?

A: Yes, we are professional about this, you can also tell me your excavator model, and we will check it for you.

 

Q: Can you provide customers’ design?

A: Sure, we can provide OEM and ODM service.

 

Q: What’s the MOQ and payment terms?

A: MOQ is 1set. Payment via T/T,L/C, Western Union accepted, other terms can be negotiated.

 

Q: How about delivery time?

A: 5-25 work days after the payment, depend on your quantity.

 

Q: How about the package?

A: Our earth auger packed by polywood case.

 

Q: Which country have you exported?

A: Vietnam, Saudi Arabia, America, Thailand, New Zealand, Canada, Australia, Peru, Chile, Brazil, Mexico, Iran, South Africa, etc.

 

/* January 22, 2571 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(“,”).forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1

Certification: CE, ISO 9001:2008
Condition: New
Drill Hole Diameter: 100mm – 1200mm
Drill Hole Depth: 1m – 30m
Bit Type: Tunsten/Rock/Sharp Teeth
Drilling Way: Rotary
Customization:
Available

|

Customized Request

post hole digger

How do post hole diggers contribute to the efficiency of tasks like deck construction?

Post hole diggers play a vital role in improving the efficiency of tasks like deck construction. They offer several benefits that enhance the overall construction process and expedite the installation of decks. Here are some ways post hole diggers contribute to the efficiency of tasks like deck construction:

  1. Precise Hole Digging: Post hole diggers allow for precise and consistent hole digging. They are designed to excavate holes of the desired diameter and depth, ensuring accuracy and uniformity in the placement of deck support posts. This precision is crucial for maintaining the structural integrity and alignment of the deck, especially when multiple posts need to be installed.
  2. Time and Labor Savings: Compared to manual digging methods, post hole diggers significantly reduce the time and physical effort required to excavate holes for deck posts. The mechanical action of the digger, whether it’s a manual or powered model, allows for quicker and more efficient digging, minimizing the need for strenuous manual labor. This time and labor savings translate to increased productivity and faster completion of the deck construction project.
  3. Consistent Hole Depth: Achieving consistent hole depths is crucial for achieving a level and stable deck structure. Post hole diggers help maintain consistent hole depths by providing depth control features or markings on the digger. This ensures that all the deck support posts are set at the same height, resulting in an even and uniform deck surface.
  4. Reduced Soil Disruption: Post hole diggers are designed to minimize soil disruption during the digging process. They remove soil from the hole without disturbing the surrounding area excessively. This is particularly important in deck construction, where the integrity of the adjacent ground needs to be preserved to support the overall stability of the deck and prevent soil erosion.
  5. Ease of Operation: Post hole diggers are designed to be user-friendly and easy to operate. They typically feature ergonomic handles, balanced weight distribution, and intuitive controls. This ease of operation reduces operator fatigue and allows for more efficient and comfortable digging, especially when multiple holes need to be excavated for a deck construction project.
  6. Versatility: Post hole diggers offer versatility in terms of the types of soil they can handle. They are designed to tackle different soil conditions, including clay, loam, gravel, or sandy soils. This versatility ensures that the digger can efficiently excavate holes in various locations, enabling deck construction in diverse geographical areas.
  7. Adaptability to Various Deck Designs: Post hole diggers can accommodate different deck designs and configurations. Whether it’s a small backyard deck or a larger multi-level deck, post hole diggers can be used to excavate holes for support posts at the appropriate locations and spacing dictated by the deck design plans. This adaptability streamlines the construction process and facilitates the realization of various deck designs.

By offering precise hole digging, time and labor savings, consistent hole depth, reduced soil disruption, ease of operation, versatility, and adaptability to various deck designs, post hole diggers significantly contribute to the efficiency of tasks like deck construction. They streamline the process, improve productivity, and help ensure the construction of a sturdy, level, and well-aligned deck structure.

post hole digger

What safety precautions should be followed when using a post hole digger?

When using a post hole digger, it is essential to prioritize safety to prevent accidents or injuries. Adhering to proper safety precautions ensures the well-being of the operator and anyone in the vicinity. Here are some important safety precautions to follow when using a post hole digger:

  1. Read the Instructions: Before using a post hole digger, carefully read and understand the manufacturer’s instructions and safety guidelines provided in the user manual. Familiarize yourself with the specific operating procedures, recommended safety equipment, and any limitations or precautions associated with the digger.
  2. Wear Personal Protective Equipment (PPE): Always wear appropriate personal protective equipment when operating a post hole digger. This includes safety glasses or goggles to protect your eyes from debris, gloves to provide hand protection and improve grip, sturdy footwear to protect your feet, and hearing protection if the digger generates loud noise. PPE helps minimize the risk of injuries and enhances operator safety.
  3. Inspect the Digger: Before each use, inspect the post hole digger for any signs of damage, wear, or loose components. Check the handles, blades, auger, and fasteners to ensure they are in good condition and properly secured. Any damaged or worn parts should be repaired or replaced before operating the digger.
  4. Clear the Work Area: Clear the work area of any obstacles, debris, or tripping hazards before using the post hole digger. Remove rocks, branches, or other objects that could interfere with the digging process or cause accidents. Maintain a safe distance from bystanders or other workers in the vicinity to prevent accidental contact or injury.
  5. Call Utility Companies: Before digging, contact the relevant utility companies to identify the location of underground utilities such as gas lines, water pipes, or electrical cables. This helps prevent accidental damage to utility lines, which can pose serious safety risks. Follow any guidelines provided by utility companies for safe digging practices in proximity to their infrastructure.
  6. Use Proper Digging Techniques: Follow the recommended digging techniques provided by the manufacturer. Use controlled and steady movements to dig the hole, avoiding sudden or jerky motions. Do not force the digger beyond its capabilities or apply excessive pressure, as this can lead to instability or damage to the digger. Pace yourself and take breaks as needed to prevent fatigue.
  7. Watch for Underground Hazards: While digging, be vigilant for underground hazards that may not be visible, such as tree roots, rocks, or buried debris. These obstacles can cause the digger to become unstable or abruptly stop, leading to accidents or injuries. If you encounter any unexpected resistance or obstruction, stop digging and inspect the area before proceeding.
  8. Store Safely: After use, store the post hole digger in a safe and secure location, out of the reach of children or unauthorized users. Store it in an upright position or as recommended by the manufacturer to prevent accidental tripping or damage. Proper storage ensures that the digger remains in good condition and reduces the risk of accidents during handling or retrieval.
  9. Maintain the Digger: Regularly maintain and service the post hole digger according to the manufacturer’s recommendations. This includes cleaning, lubricating moving parts, inspecting for wear or damage, and replacing any worn or damaged components. Well-maintained equipment operates more safely and efficiently, reducing the risk of accidents.

By following these safety precautions, operators can minimize the risk of accidents or injuries when using a post hole digger. Prioritizing safety through proper equipment usage, wearing appropriate PPE, inspecting the digger, clearing the work area, identifying underground utilities, using proper digging techniques, watching for hazards, storing the digger safely, and maintaining the equipment ensures a safer working environment and promotes responsible operation.

post hole digger

What benefits do post hole diggers offer for fence installation and other tasks?

Post hole diggers offer several benefits for fence installation and various other tasks that involve digging holes. Here are some of the advantages they provide:

  1. Efficiency: Post hole diggers, whether manual or motorized, significantly improve the efficiency of digging holes compared to alternative methods. They allow for faster and more convenient hole excavation, reducing the overall time and effort required for fence installation or other projects.
  2. Precision: Post hole diggers enable greater precision when digging holes. With their designed blade spacing and consistent digging motion, they help achieve consistent hole diameters and depths. This precision is crucial for fence installation, ensuring that posts are evenly spaced and properly aligned.
  3. Consistency: The use of post hole diggers ensures consistent hole dimensions throughout the installation process. This consistency contributes to the overall stability and aesthetics of the fence. Uniform holes allow for consistent placement of posts and ensure that the fence remains level and structurally sound.
  4. Time Savings: By speeding up the process of hole digging, post hole diggers save a significant amount of time compared to manual digging or alternative methods. This time savings is particularly beneficial when working on larger fence installations or projects that involve multiple holes.
  5. Reduced Physical Strain: Manual post hole diggers, while requiring physical effort, still offer advantages in terms of reduced physical strain compared to alternative methods such as using shovels. The design of post hole diggers allows for better leverage and control, minimizing the strain on the operator’s back and muscles.
  6. Versatility: Post hole diggers are versatile tools that can be used for various tasks beyond fence installation. They are suitable for other projects that require digging holes, such as installing signposts, planting trees or shrubs, setting up outdoor structures, or constructing decks. Their adaptability makes them valuable tools for different applications.

Overall, post hole diggers offer efficiency, precision, consistency, time savings, reduced physical strain, and versatility when it comes to fence installation and other tasks involving hole digging. Choosing the appropriate post hole digger based on the specific project requirements can greatly enhance the effectiveness and success of the task at hand.

China supplier Hydraulic Post Hole Auger Drill for Mini Excavator Backhoe Loader   pto shaft cover removalChina supplier Hydraulic Post Hole Auger Drill for Mini Excavator Backhoe Loader   pto shaft cover removal
editor by CX 2024-04-10

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *